Rehabilitation of flood affectees
Torrential rains and flooding have submerged a third of Pakistan and killed more than 1190 people, including 399 children creating an unprecedented climate catastrophe. Houses in the settlements situated near the Indus River have been swept away along with most of the crops. Overall 370 thousand houses were destroyed while 730 thousand more have been partially damaged.
The Helpline has decided to provide shelter to the affected families before the forthcoming winters. An economical model house has been designed. The drawing and cost of this model house along with the estimated cost are being offered to kind-hearted people.


DONATE AND GIVE A NAME
Metrological Department has warned that the forth coming winter will be extremely severe. In Rajanpur alone, there are over 10,000 shelter less families living in the open or best in tents.
Kindly join hands with HelplineĀ® who has in Phase 1, taken a humble start by commencing construction of 100 houses in Rajanpur for flood affectees on emergency basis. The cost of 1 house with covered area of 630 sqft is Rupees 6 Lac.
Donation for the house can be lump sum or in parts as per convenience of the donor.
Adopt a house and give a name to your dear ones.
SINGLE UNIT HOUSE (2 X BED VERANDA & KITCHEN)

- Kingar brick = 4500 @ 8 = Rs. 36000
- 1st class brick = 17000 @ 12 = RS. 204000
- Cement = 70 bags @ 1100 = Rs. 77000
- Roof with T-Iron & garder = 550 sft @ 180 = Rs. 99000
- Steel = 100 kg @ 220 = Rs. 22000
- Steel door with frame = Rs. 35000 (3 doors)
- Bajar = 220 cft @ 55 = Rs. 12100
- Brick bajar for flooring = 200 cft @ 35 = Rs. 7000
- M/S Steel Grill with wire gauze = 50 sft @ 400 = Rs. 20000
- Sand = 900 cft @ 16 = Rs. 14400
- Crush = 150 ft @ 80 = Rs. 12000
- Mud = 300 cft = Rs. 6000
- Polythene = 20 kg = Rs. 2000
- Sink / PPRC / UPVC = 3000 + 10000 + 7000 = Rs. 20000
- Cable + wiring = 13000 + 12000 = Rs. 25000
- Mason + Plumber + Electrician = Rs. 66000
- Labour and Back Filling = Rs. 100,000
Ā Ā Ā Ā TOTAL = Rs. 750,000 /-
ADDITIONAL FACILITIES

TOILET
- Brick = 700 @ 12 = Rs. 8400
- Cement = 6 bags @ 1100 = Rs. 6600
- Sand = 100 ft @ 16 = Rs. 1600
- Crush = 30 ft @ 80 = Rs. 2400
- Indian W/C = 1 nos @ 3000 = Rs. 3000
- PPRS/upve = 1 nos @ 7000 = Rs. 7000
- Steel Door (7 x 2 Ā½ ) = Rs. 9000
- Ventilator = Rs. 3000
- T-Iron Roof = 35 sft @ 190 = Rs. 6650
- Polythen = 5 kg @ 200 = RS. 1000
- Mason + Plumber + Electrician = Rs. 9000
Ā Ā Ā Ā TOTAL = Rs. 57650
BATH (6ā- 4 Ā½āā X 4ā ā 00)
- Bricks = 500 @ 12 = Rs. 6000
- Cement = 5 bags @ 1100 = Rs. 5500
- Sand = 70 ft @ 16 = Rs. 1120
- Crush = 30 ft @ 80 = Rs. 2400
- Shower set = 1 nos @ 6000 = Rs. 6000
- PPRS/upve = 1 nos @ 7000 = Rs. 7000
- Steel Door = 1 nos @ 9000 = Rs. 9000
- Ventilator = 1 nos @ 3000 = Rs. 3000
- T-Iron Roof =35 sft @ 190 = Rs. 6650
- Mason + Plumber + Electrician = Rs. 9000
SOAKAGE PIT (6ā X 4ā X 12ā)
- Excavation = 288 cft @ 20 = Rs. 5760
- Brick rori = 30 cft @ 35 = RS. 1050
- Bajar = 20 cft @ 55 = Rs. 1100
- Ā½āā Aggregate = 20 cft @ 80 = Rs. 1600
- Cement for top slab = 5 bags @ 1100 = Rs. 5500
- Sand = 15 cft @ 16 = Rs. 240
- Crush = 25 cft @ 80 = Rs. 2000
- Steel = 30 kg @ 220 = Rs. 6600
- Mason = 2 nos @ 1500 = Rs. 3000
Ā Ā Ā Ā TOTAL = Rs. 26850
STAIRS (3ā.5āā X STEP 11āā RISER 7āā Ā½)
- Cement = 13 bags @ 1100 = Rs. 14300
- Sand = 30 ft @ 16 = Rs. 480
- Crush = 50 ft @ 80 = Rs. 4000
- Steel = 80 kg @ 220 = Rs. 17600
- Frame work = 150 sft @ 30 = Rs. 4500
- Steel Fiber = 1 nos @ 1500 = Rs. 1500
- Mason labor = 4 nos @ 1500 = Rs. 6000
Ā Ā Ā Ā TOTAL = Rs. 48380
9āā BOUNDARY WALL (60 Rft)
- Cement = 20 bags @ 1100 = Rs. 22000
- Brick = 700 @ 12 = RS. 84000
- Sand = 150 cft @ 16 = Rs. 2400
- Crush = 20 cft @ 80 = Rs. 1600
- Main gate = 56 sft @ 500 = Rs. 28000
- Mason labour = 9 @ 1500 = Rs. 13500
Ā Ā Ā Ā TOTAL = Rs. 151,500
Way to Donate
UBL to UBL : 063501118170
IBAN : PK69UNIL0112063501118170
Other Bank to UBL : 063563501118170
BANK : UBL C Block Model Town, Lahore.